Buy Agtnan: Monster Shutdown Sequence PC Key

Where to buy Agtnan: Monster Shutdown Sequence at the best price? As of 1 Sep 2026 this title has one offer, $4.49 at Steam. On PC that is the usual case, because only about one title in four gets a keyshop offer and the rest stay with the platform store. There is nothing to compare, but we track this price daily and show how it stands against earlier readings, and a price alert will tell you about any drop. On PC you buy a key that you activate in Steam or another client, and this is the widest market we track, with more than a quarter of games carrying a keyshop offer.

Release: 21 Jul 2022
AAGH Games, LLC
AAGH Games, LLC
Metacritic:
tbd tbd
Steam:
Overwhelmingly Negative (1)
Keyshops
Unavailable
Buy in Official Store:
$4.49
Buy in Keyshops:
See price history

Official Stores (1)

DRM:
Steam
Steam
Steam
Agtnan: Monster Shutdown Sequence
Windows
7w ago
DRM:
Steam
Steam
$4.49

About Agtnan: Monster Shutdown Sequence

Agtnan: Monster Shutdown Sequence - about the game
Control your robot through non-stop sci-fi survival action in intense 90s-inspired FPS arenas. Navigate unique maps packed with explosive boxes, warp tubes, moving floors, portals, bombs, puzzles, and physics-based traps to outsmart waves of monsters. Fight back with powerful weaponry, collect Creds from defeated enemies to upgrade tech abilities, and master each arena's obstacles to trigger the shutdown. This action game delivers classic arena challenges at your own pace. Survive thrilling elements across themed maps while honing quick reflexes and clever strategies. Robot enthusiasts of all ages test their skills against relentless monster assaults.

Non-stop sci-fi survival action

Take control of your robot's destiny in AGTNAN: Monster Shutdown Sequence! Featuring unique maps, themes, and mechanics, you'll need to be quick on your feet and use your wits to survive. Use explosive boxes, warp tubes, moving floors, portals and more to outsmart the enemy and make it to the end. Put those monsters in their place with the Monster Shutdown Sequence - an exciting adventure for robot-lovers of all ages!

Put your skills to the test and navigate through unique arenas full of intense action and thrilling challenges. Outlast waves of monsters with bombs, puzzles, and physics-based mechanics, while exploring fun and exciting theme maps. Experience classic 90s-inspired FPS arenas at your own pace, while mastering each map's danger and traps in order to survive the shutdown.
Take on the Monster Shutdown Challenge

• Take on each uniquely designed map with its own set of thrilling elements and obstacles.
• Fight back with powerful weaponry, including explosive boxes that spawn regularly.
• Improve your tech abilities with fallen enemies' Creds and unlock even more powerful features.
• Relive the golden age of arena FPS gaming with classic 90s visuals and mechanics.
Interface:
English

Age rating

Unavailable
Metacritic:
tbd tbd
Steam:
Overwhelmingly Negative (1)

Minimum:

  • Processor: Dual-core
  • Memory: 4 GB RAM
  • Graphics: DirectX 9 compatible
  • Storage: 700 MB available space

Recommended:

  • Processor: Quad-core
  • Memory: 4 GB RAM
  • Graphics: DirectX 9 compatible
  • Storage: 700 MB available space
Historical low
Price history from official stores
$4.04
Steam
2 months ago
Price history from keyshops
-
-
-

FAQ

8 questions

Before you start looking for a cheap Agtnan: Monster Shutdown Sequence PC key, check the essentials. Developed by AAGH Games, LLC. Published by AAGH Games, LLC. PC released date: 21 Jul 2022. Genres: Action. Categories: Family Sharing, Single-player, Stats, Steam Achievements, Steam Cloud.

Q

Where to buy a cheap Agtnan: Monster Shutdown Sequence Steam key or CD key?

Using our price comparison and verified discount codes, you can buy a Agtnan: Monster Shutdown Sequence key for as low as $4.49. This deal is available at Steam and is among the cheapest offers on the market. All keys listed on XD.deals are delivered digitally and eligible for instant download after payment. Prices already include processing fees and applied promo codes, so you always see the lowest Agtnan: Monster Shutdown Sequence price on PC. Check the Agtnan: Monster Shutdown Sequence price history to buy at the best moment.

As of our last update (we refresh Steam pricing multiple times a day), the Agtnan: Monster Shutdown Sequence Steam price is $4.49. You can save an extra ~6% by paying with a discounted Steam gift card.

Our price tracker covers both official retailers and key marketplaces, so you can find Agtnan: Monster Shutdown Sequence on sale even outside seasonal promotions. We currently detect 1 active offer from official stores and keyshops. Check the table above, compare against the historical low, and set an alert so you never miss the next price drop.

Based on our data, Agtnan: Monster Shutdown Sequence is not currently available on GeForce NOW. You will need to run it locally on your PC. Browse games available on GeForce NOW.

Yes. Agtnan: Monster Shutdown Sequence has an official page on the Steam Store. You can also buy a Agtnan: Monster Shutdown Sequence Steam key from third-party sellers. Our price comparison currently includes 1 offer with Steam DRM. Pick one to ensure your Agtnan: Monster Shutdown Sequence download happens on Valve's platform.

Not at this time. Valve marks Agtnan: Monster Shutdown Sequence as Unsupported on Steam Deck. Keep an eye on XD.deals - we track Proton updates and community fixes. Browse games that are Steam Deck Verified or Steam Deck Playable.

According to our data Agtnan: Monster Shutdown Sequence is not currently available on PC Game Pass, EA Play or Ubisoft+. We are still filling in the catalogues of these services, so it is worth confirming the status at the source before you decide. If you are buying, XD.deals will help you find the lowest price.

No - XD.deals is not a store. We are a price-comparison service that tracks the best Agtnan: Monster Shutdown Sequence deals across official stores and verified keyshops. Click "Go to Store" next to any offer and you will be redirected to the retailer's website to complete your purchase.

Best prices for Agtnan: Monster Shutdown Sequence

1 Steam Steam Official
$4.49

Want to buy at the best moment? Set a price alert on XD.deals and get notified when Agtnan: Monster Shutdown Sequence hits its next historical low.

Create Alert
Join our Discord
Get instant help from our community and stay updated on the latest deals
Set Price Alerts
Get notified by email when game prices drop to your target
Create Free Account
Unlock wishlists, price alerts, and Steam sync