A depot and the underground point of return round up the scenery nicely. The route is partly with other traffic and without and creates a high amount of diversity. That way the virtual tram driver has an authentic driving experience and has to always keep track of his surroundings. The add-on Tram Essen/Gelsenkirchen offers a lot of new possibilities for the world of OMSI.
Focus of the add-on is the tram NF6D (MGT6D) that was developed in Kassel in 1988. It uses three-phase drive and is 28,6 meters long and 2,3 meters wide.
Maximum speed of the tram is 70 km/h and allows to transport 171 people at max. In contrast to many other trams it doesn’t ride on the normal railway but on the for the Ruhr district typical meter-gauge tracks.
The tram was the first that was suited for the large-floor area and 42 trams have been delivered to the BOGESTRA in 1992.
- Tramlines with 15 stops
- Map is based on the cities Essen and Gelsenkirchen
- More than 100 individual objects, buildings and new rails
- Parts of the route are in the Underground
- Real timetable dates of EVAG
- Including a Tram Typ NF6D of BOGESTRA
- Including some paints of other transport companies