Comprar Hydro PC

Em 16 mar. 2026, a chave Hydro mais barata custa R$ 28,01 na Kinguin. XD.deals compara preços de 2 lojas entre 2 ofertas. Nos keyshops o preço mais baixo é R$ 28,01 (47% de desconto), as lojas oficiais começam em R$ 29,99 (0% de desconto). Dados fornecidos por XD.deals.

Lançamento: 01 ago. 2025
Comprar em Loja Oficial:
R$ 29,99
Comprar em Keyshops:
-47%
R$ 28,01
Ver histórico de preços

Lojas Oficiais (1)

DRM:
Steam
Steam
Steam
Hydro
Windows
há 4d
DRM:
Steam
Steam
R$ 29,99

Keyshops (1)

DRM:
Steam
Steam
Kinguin
Hydro PC Steam CD Key
Windows
há 6h
DRM:
Steam
Kinguin
R$ 53,64 R$ 28,01
-47%
-8% with XD8DEALScopy
-8% with XD8DEALScopy

Sobre Hydro

Hydro - sobre o jogo

  • Realistic simulation of a 1930s-era vintage hydro-electric power station

  • Interact with vintage machinery and manage your fatigue levels - across day and night shifts

  • Realistic day and night cycle and player rest phases

  • Dynamic weather system - random fog, rain, thunder and lightning affecting game play

  • React to over three dozen (36+) unique demands for township power and get rewards (or not!)

  • Order supplies, monitor reserves and maintain oil levels and fuses

  • Research and apply over a dozen (12+) unique upgrades to enhance the power station

  • Maintain a series of power poles within the immediate area and ensure your power output is reliable

  • Reputation system - your actions can have long-lasting effects!

  • House-keeping requirements - wipe-up oil stains, clean windows and graffiti

  • Contend with multiple auditors who will occasionally visit and check your performance

  • Almost endlessly-varied game play and multiple game-ending events

  • Customize your experience! Adjustable difficulty settings means fun for both casual and 'hardcore' players alike

WELCOME TO HYDRO!

Get-to-grips with vintage machinery from yesteryear! 

The local township has directed old No. 101 Hydro-electric Power Station be pressed back into duty and you're the sole custodian for the job!

Keep your wits: not only generating power quietly, without blowing fuses or starting fires, but also managing and maintaining your power station's supply levels (e.g. gear oil, fuses, battery acid) to keep it running smoothly.

You'll also need to manage your fatigue levels and work efficiently to stay profitable and keep your funding levels in the green - or risk shutdown by the township's council.

WHEN THE RIVER IS WILD...

Generate power day and night so long as the river is flowing fast.  Your main goal in Hydro is to generate electricity for the Township whilst dealing with obstacles that come your way.

Work both day and night shifts, encounter unique events and township power demands based on the time of day.

CONNECT ("SYNC") TO THE TOWNSHIP POWER GRID

Use quick reflexes to connect to the township power grid!  But be careful not to blow that Grid Fuse!  Did you remember to order a spare grid fuse?

FEED POWER TO THE TOWNSHIP

The township is hungry for power, so Hydro must be ready to deliver!  In addition, sometimes they'll need a helping hand with delivering peak-load power demands; thus, you'll be receiving 'Township Demands' from the township when there is a power shortage

Respond to over two-dozen such demands ranging from mayor press conferences and town carnivals all the way to popular radio shows in the evenings and new factory commissioning events.

Ensure your machinery and components are in tip-top shape and manage fatigue levels so that you can stay on-shift for the duration and generate the required power, otherwise you'll miss out on much-needed funding to stay afloat.

REPUTATION SYSTEM / NEWSPAPERS

As sole custodian of Hydro, start your career with the full support of the township! However, your shiny reputation rating is in danger of being chipped-away if you fail to make the grade.

Claw-back your reputation rating with careful management of the power plant!

Your negative actions may land you in the township's newspaper.  Conversely, if you do a good job, you may just hear about it, too.

KEEP THE LIGHTS ON

Your power station will need its on-site battery accumulators charged so you can keep your own lights on. You'll be leaning on your trusty old generator once again to help make this happen.

Accumulators are not endlessly robust resources - they need care - charge them too fast and their 'condition' rating drops, meaning they won't charge efficiently (and in the worst case, will struggle to charge at all).  As you charge the accumulators and run the local services such as power station lighting, you'll be wearing-out the local power fuses which will also need attention...

APPLY UPGRADES!

You'll be dealing with a lot of antiquated machinery, so by using your 'Upgrade Blueprint', you'll be able to bring the old power station into the modern age (almost), and make it perform better than ever before!

WHEN THINGS GO WRONG...

  • Watch that old Generator! It has a tendency to overheat and it may well just catch fire one day if you're not careful.

  • Destroying your generator ends your Hydro career.  Emergency systems like the Generator Fire Control system - if primed and used promptly - might save your generator...this time. 

  • Fail to lubricate machinery and the power station becomes host to a shower of sparks and a cacophony of noises and you may get noise complaints, some with monetary fines attached (but always affecting your reputation rating).

  • Fail to keep the accumulator maintained and it will struggle to take a healthy charge...this will have all sorts of ill-effects on your on-site power requirements.

  • Fail to keep your network of power poles maintained and you'll find your grid output will suffer frequent 'drop-outs' of power

  • Fail to generate sufficient funding and end up in excessive debt and you may find the township treasury department will take a keen interest in your power station and you'll even risk complete power station shutdown.

HOUSEKEEPING

You're responsible for the keeping the place presentable! Clean windows and wipe up oil stains before the auditor sees...and maybe wipe-off the occasional graffiti tag...

CALM DAYS / AUDITORS

On calm river days, perform maintenance like replacing or fixing fuses, cleaning power pole insulators, researching part upgrades, cleaning the air filter, oil stains and windows and keeping the machinery oil levels topped-up.

But keep an ear out for the auditor(s)! They'll fine you every chance they get if something isn't quite right.  Some are more strict than others, and some are downright lazy.  Use some creativity to keep them at-bay...

SHIPS PASSING IN THE NIGHT

Given the bulky machinery and narrow river banks, occasionally-passing ships will need lighting guidance in the form of marker lights along the river bank, which you'll need to maintain and manage.

MANAGE YOUR FATIGUE

As the sun dips down towards the horizon, you'll find a sleeping quarters to rest and recharge between shifts. Use the opportunity to address your fatigue levels and start the next shift...maybe take another stab at keeping the township powered-up?

DYNAMIC WEATHER

Weather effects are completely random and variable and the weather has an effect on your game play in the Hydro world...meaning that Mother Nature can both help (or hinder) you. For example:

  • Rain will soak newspapers but can also help clean certain electrical components like power line insulators.

  • If lightning strikes your power station (or you!), there will be certain variable consequences...

PLAY IT YOUR WAY

The Hydro experience is designed with both casual and 'hardcore' gamers in mind. Adjustable difficulty allows for a customizable experience! Don't like having those auditors on your back? Put them on strike!  Disable or enable noise complaints at your whim, or close the shipping lane and focus purely on generating power. Choose daylight savings so your days are lengthened, and many other settings await your adjustment.

(ALMOST) ENDLESSLY-VARIED GAME PLAY!

In Hydro, things never go to plan and nothing ever happens the same way twice.  Some fuses might wear faster than others, your oil levels may consume faster sometimes (and sometimes not), supply costs will fluctuate, funding rewards will vary and even Mother Nature will at times throw a curve-ball with its ever-changing river flow speeds and weather conditions.  Maybe you'll get a strict auditor visit and fine you for an errant oil stain you forgot to clean-up...

Resting in between each shift (day or night) will randomly generate calm or fast-flowing river conditions in addition to the usual day/night cycle change and weather changes, so no play-through of the game is ever the same!

May the waters flow forever fast and your fuses last forever long...

Interface:
English
Áudio:
English

Classificação etária

Indisponível

Requisitos do sistema

Mínimo:

    Minimum:
    • Requires a 64-bit processor and operating system
    • OS: Windows 10
    • Processor: Intel or AMD
    • Memory: 8 GB RAM
    • Graphics: GeForce GTX 1070
    • Storage: 4 GB available space
    • Additional Notes: Requires a 64-bit processor and operating system; utilises Unreal Engine 5.4 Nanite tessellation which some AMD GPUs may encounter graphical issues displaying. If you own an AMD GPU, please download and test the Demo prior to purchase, for avoidance of any doubt.

Recomendado:

    Recommended:
    • Requires a 64-bit processor and operating system
    • OS: Windows 11
    • Processor: Intel or AMD
    • Memory: 16 GB RAM
    • Graphics: GeForce RTX 3070 8GB or better
    • Storage: 4 GB available space
    • Additional Notes: Requires a 64-bit processor and operating system; utilises Unreal Engine 5.4 Nanite tessellation which some AMD GPUs may encounter graphical issues displaying. If you own an AMD GPU, please download and test the Demo prior to purchase, for avoidance of any doubt.
Mínimo histórico
Histórico de preços das lojas oficiais
-
-
-
Histórico de preços dos keyshops
-
-
-
Junte-se ao nosso Discord
Obtenha ajuda instantânea da nossa comunidade e mantenha-se atualizado sobre as últimas ofertas
Definir Alertas de Preço
Seja notificado por email quando os preços dos jogos baixarem para o seu objetivo
Criar Conta Gratuita
Desbloqueie listas de desejos, alertas de preço e sincronização Steam

FAQ

8 perguntas

Antes de começar a procurar uma CD Key barata de Hydro, reserve um momento para verificar o essencial. Desenvolvido por Harman Motor Works. Publicado por Harman Motor Works. Data de lançamento PC: 01 ago. 2025. Géneros: Action, Indie, Casual, Simulation, Adventure. Categorias: Family Sharing, Single-player.

Q Posso jogar Hydro no Steam Deck?

Não, neste momento não. A Valve marca Hydro como Não Suportado no Steam Deck, então não funcionará via Proton neste momento. Fique atento ao XD.deals - acompanhamos avanços do Proton e correções da comunidade, e sinalizaremos assim que houver uma forma funcional de jogar Hydro no Steam Deck.

Sim. Existe uma versão Steam de Hydro. Escolha qualquer oferta com a etiqueta Chave Steam no XD.deals, resgate-a no cliente desktop e jogue Hydro no Steam PC.

Sim. Depois de resgatar a sua chave Steam, pode iniciar Hydro no Modo Offline via Steam. Os seus ficheiros de gravação serão sincronizados da próxima vez que ficar online.

Sim, pode comprar uma Chave Steam de Hydro diretamente na Steam Store. No XD.deals, agregamos todas as ofertas Steam DRM disponíveis para que possa comparar ofertas Steam baratas de Hydro num só lugar.

Encontrará todas as promoções e descontos ativos de Hydro aqui mesmo no XD.deals. O nosso rastreador de preços lista atualmente 1 ofertas de lojas oficiais e 1 ofertas de keyshops. Verifique a tabela acima para o preço mais baixo, compare com o mínimo histórico do jogo e defina um alerta de preço para nunca perder a próxima descida.

Com o XD.deals, os jogadores de PC podem ver instantaneamente onde comprar uma chave PC Steam barata de Hydro. O nosso motor de comparação de preços em tempo real e base de dados de cupões curada acompanham todas as lojas oficiais e keyshops de confiança para que não tenha de o fazer. Neste momento detetamos este jogo em 2 ofertas ativas de lojas e keyshops.

Sim. Uma página oficial de Hydro na Steam Store está ativa, então pode comprar Hydro no Steam ou comprar qualquer Chave PC Steam de Hydro no XD.deals e resgatá-la instantaneamente.

Não - o XD.deals em si não é uma loja. Somos um serviço de comparação de preços que acompanha as melhores ofertas de Hydro em lojas oficiais e keyshops verificadas. Clique em "Comprar agora" junto à oferta desejada e será redirecionado para o site do vendedor para concluir a compra e receber a chave lá.

Melhores preços para Hydro

1 Kinguin Kinguin Keyshop
-47% R$ 28,01
2 Steam Steam Official
R$ 29,99

Pronto para começar? Defina um alerta de preço no XD Deals e obtenha uma chave Steam com desconto de Hydro assim que atingir o próximo mínimo histórico.

Criar Alerta